LNG

Vinod Gupta

The Gladstone LNG Plant facility consists of 2-LNG trains with a combined capacity of approximately 7.8MTPA, with associated utilities and support facilities.

The power demand for the facility is met by on-site power generation consisting of Gas Turbines and diesel generators.  The power distribution network consists of High (6.6kV and

Vinod Gupta - Principal Electrical Engineer, Santos

When: 

Tue, 15 Jul 2014 - 06:00pm AEST

Location: 

Adelaide, SA
Subscribe to LNG